怎么保證石膏粉的施工完好?
來源:http://www.netjobs.cc 日期:2019-02-12 發布人:
想保證石膏粉施工的完好,要嚴格按照執行標準來操作。對于石膏粉施工執行標準,我們也整理了一些信息。
In order to ensure the completion of gypsum powder construction, it is necessary to strictly follow the implementation standards. For the implementation standard of gypsum powder construction, we also collated some information.
首先,脫硫石膏粉生產設備施工前對基層的處理是極有必要的,要確保基層平整,如有凹凸不平處需及時處理;根據基層墻面的吸水率進行濕潤,待表面無浮水再進行抹灰施工。
First of all, it is very necessary to treat the base before the construction of desulfurization gypsum powder production equipment. It is necessary to ensure the level of the base, if there are bumps, to deal with them in time; wet the base wall according to the water absorption rate, and then plaster the surface without floating water.
用石膏粉配制的砂漿的抹灰工藝與傳統抹灰工藝相同,需要按規定掛線,找規矩進行墻面抹灰。石膏粉的具體施工方法如下所述:
The plastering process of mortar prepared with gypsum powder is the same as that of traditional plastering process. It needs to hang wires according to the regulations and find rules for wall plastering. The concrete construction method of gypsum powder is as follows:
1根據設計要求、工程造價等實際情況來選擇底層砂漿配合比,然后進行墻面抹灰。
1. Select the mix proportion of bottom mortar according to the design requirements, engineering cost and other actual conditions, and then carry out wall plastering.
2按傳統工藝對內墻及頂棚進行抹灰刮糙,依據標志及標筋用刮杠刮平,后用木砂板搓平壓實。
2. According to the traditional technology, plastering and scraping the interior wall and ceiling, scraping with scraper according to the sign and reinforcement, and finally rubbing and compacting with wood sand board.


3脫硫石膏粉生產設備可采用凈漿或混合料漿作為面層抹灰材料,用水量要以適應氣候條件、便于施工為宜。拌灰量要適宜,確保當天能用完,避免造成浪費。在底層砂漿差不多七八成干時進行面層抹灰,用鐵板壓實壓光。
3. Clean slurry or mixed slurry can be used as surface plastering material for desulfurization gypsum powder production equipment. The water consumption should be adapted to climatic conditions and convenient for construction. The amount of ash mixing should be appropriate to ensure that it can be used up on the same day, so as to avoid waste. When the bottom mortar is about 78% dry, the surface is plastered and compacted with iron plate.
4等面層抹完12-24小時后,用細砂紙將表面紋路抹平,再用濕布擦洗一遍便可達到中高級抹灰標準。
4. After 12-24 hours of plastering, the surface lines are smoothed with fine sandpaper, and then scrubbed with a wet cloth to reach the intermediate and advanced plastering standards.
今天的內容就先為大家介紹到這里了,如果您有濟南石膏粉的其它疑問,歡迎您點擊我們的官網進行咨詢:http://www.netjobs.cc/
Today's content is introduced here. If you have any other questions about Jinan gypsum powder, you are welcome to click on our official website for consultation: http://www.netjobs.cc./
主站蜘蛛池模板:
一个人免费观看视频www中文|
久久久久久久综合日本|
国产91网|
美腿丝袜美腿国产在线|
99热精品久久只有精品|
国产一国产一级新婚之夜|
国产精品原创不卡在线|
成人无码特黄特黄AV片在线|
黑人粗大猛烈进出高潮视频|
美日韩精品综合一区二区|
一区二区在线中文字幕|
国产农村激情免费专区|
亚洲三级黄色大片|
2019国产精品青青草原|
麻豆国产av尤物网站尤物|
欧美成人性色生活片|
四虎国产精品免费久久久|
国产成人综合久久精品下载|
国产亚洲视频免费播放|
亚洲中文字幕永码永久在线|
精品一区二区三区视频免费观看|
日韩高清日韩一区二区三区四区|
国产在线自拍一区二区三区|
夫妻免费无码v看片|
久久男人av资源网站|
亚洲成亚洲乱码一二三四区软件|
偷窥村妇洗澡毛毛多|
在线毛片免费|
国产色视频一区二区三区|
亚洲の无码热の综合|
国产欧美日韩a片免费软件
|
亚洲国产一区二区在线|
国产美女胸大一区二区三区|
亚洲人成网7777777国产|
性饥渴女邻居4伦理hd|
日本精品中文字幕在线不卡
|
国产精品毛片在线完整版|
樱花草在线影视WWW中文字幕|
四虎影视88aa久久人妻|
欧美日产国产精品|
国产最新av在线播放不卡|

魯公網安備