行業(yè)資訊
聯(lián)系我們
濟(jì)南福華建材廠
聯(lián)系人:吳老師
電話:
手機:13864111871
0531-81901300
地址:山東省濟(jì)南市高新開發(fā)區(qū)巨野河辦事處山圈村西
抹面砂漿施工后的養(yǎng)護(hù)事項
來源:http://www.netjobs.cc 日期:2023-05-22 發(fā)布人:
抹面砂漿在施工后需要馬上保養(yǎng),保養(yǎng)需要留意施工時的溫度,在依據(jù)溫度的狀況確認(rèn)保養(yǎng)時需要準(zhǔn)備的材料,此外也是有無需保養(yǎng)的產(chǎn)品,具體保養(yǎng)條件如下所示:
The plastering mortar needs to be maintained immediately after construction, and attention should be paid to the temperature during construction. The materials that need to be prepared for maintenance should be confirmed based on the temperature condition. In addition, there are products that do not require maintenance, and the specific maintenance conditions are as follows:
冬天施工日平均氣溫小于5°C時要按冬天施工并滿足以下規(guī)定:
When the average daily temperature during winter construction is less than 5 ° C, it should be carried out in winter and meet the following requirements:
1.施工前要采取一定的有效措施加熱基礎(chǔ)表層,使其溫度維持在KTC以上,并清理存水。
1. Before construction, effective measures should be taken to heat the surface layer of the foundation, maintain its temperature above KTC, and clean up any stored water.
2.受冷前,水泥基工程材料的抗壓程度不可小于6MPa。
Before being cooled, the compressive strength of cement-based engineering materials should not be less than 6MPa.
高溫氣候環(huán)境施工施工位置溫度超過37°C,應(yīng)按高溫氣候延緩施工并滿足以下規(guī)定:
If the temperature of the construction site in a high-temperature climate exceeds 37 ° C, the construction should be postponed according to the high-temperature climate and meet the following requirements:
1.施工前24小時采取一定的有效措施,避免施工位置受到遭受直射或別的輻射熱。
1. Take effective measures 24 hours before construction to avoid direct sunlight or other radiation heat at the construction site.
2.采取適度減溫措施,與水泥基工程材料接觸的混凝土基礎(chǔ)和設(shè)備底板的溫度不可超過37°C。
2. Take appropriate temperature reduction measures, and the temperature of the concrete foundation and equipment bottom plate in contact with cement-based engineering materials shall not exceed 37 ° C.


3.濟(jì)南抹面砂漿料漿的入模溫度不可超過35°C。
3. The molding temperature of Jinan plastering mortar slurry should not exceed 35 ° C.
4.施工后應(yīng)及時采取補濕保養(yǎng)措施。
4. Moisturizing and maintenance measures should be taken promptly after construction.
施工溫度超過5°小于37°時,基礎(chǔ)施工后無需保養(yǎng)。超過溫度范圍應(yīng)遵循抹面砂漿施工保養(yǎng)方法實行保養(yǎng)。
When the construction temperature exceeds 5 ° C but is less than 37 ° C, there is no need for maintenance after the foundation construction. If the temperature exceeds the range, the maintenance method for plastering mortar construction should be followed for maintenance.
冬天保養(yǎng)需要準(zhǔn)備的材料:棉被、薄膜這些材料主要是為了保溫,因為冬天溫度過低,因此需要做好保溫防范準(zhǔn)備
Materials that need to be prepared for winter maintenance: cotton quilts, thin films, etc. These materials are mainly used for insulation. Due to the low temperature in winter, it is necessary to prepare for insulation prevention
夏天保養(yǎng)需要準(zhǔn)備的材料:薄膜,薄膜主要是為了補濕,預(yù)防水分的太早外流造成產(chǎn)品施工內(nèi)部無法牢固。
Materials that need to be prepared for summer maintenance: thin film, which is mainly used to supplement moisture and prevent the early outflow of moisture from causing the internal construction of the product to become unstable.
此外一定要按時灑水,灑水的也是為了補濕,因為在施工后內(nèi)部反應(yīng)需要大量水分。更多相關(guān)事項就來我們網(wǎng)站http://www.netjobs.cc咨詢聯(lián)系吧!
In addition, it is important to sprinkle water on time, as it is also used to supplement moisture, as internal reactions require a large amount of water after construction. For more related matters, come to our website http://www.netjobs.cc Contact for consultation!
主站蜘蛛池模板:
一区二区三区四区在线 | 网站
|
15gay男同志同性1069|
免费无码在外自慰喷水|
亚洲av无码牛牛影视在线二区|
久久发布国产伦子伦精品|
亚洲日本乱码中文在线电影|
少妇wwwb搡bbb搡bbb|
开心激情站开心激情网六月婷婷|
无码高清视频在线播放十区|
开心激情站开心激情网六月婷婷
|
久久国产精品成人影院|
成人午夜福利免费体验区|
日本精品一区二区三区四区|
人伦片无码中文字幕|
国产在线视频自拍|
日本十八禁漫画无遮挡|
亚洲欧美一级一级a|
国产成人亚洲综合无码精品|
成全在线观看免费高清动漫|
成人久久免费网站|
亚洲AV福利天堂在线观看|
亚洲熟妇av不卡一区二区三区|
无码aⅴ精品一区二区三区|
中文字幕亚洲最大中文|
国产成人精品视频一区视频二区|
极品无码国模在线观看|
成人无码免费一区二区三区|
偷窥国产亚洲免费视频|
亚洲精品国产成人片|
亚洲中文字幕精品第一页|
久久国产精品无码一区二区三区|
亚洲综合色成在线观看|
亚洲人成影视在线观看|
亚洲综合网一区中文字幕|
精品视频国产香蕉尹人视频|
精品无码一区二区三区爱欲九九|
国产成人精品白浆久久69|
人在线看天堂无码|
国产高潮刺激叫喊视频|
亚洲熟妇色xxxxx欧美老妇|
欧美freesex黑人又粗又大|

魯公網(wǎng)安備